Since the weather so so nice I spent some time, in fact a lot of time, degreasing R2D2.


Not a huge amount has happened since my last post. Parts de-greased and de-painted
View attachment 223239
A few of the smaller pieces have had some primer splashed on. I do hate painting...
One more gasket made for the valve plate, now that the correct thickness has turned up. That took a good hour to do.One more to follow when the mood takes me.
The correct V-belt has arrived along with the new motor bearings and some eyelets for the motor tails. Still awaiting silicone sleeving and some anti-flashover resin to give the field windings a coating of.
Also, Machine Mart have been very slow supplying the synthetic oil, so can't reassemble the bottom end.
I suppose I'll have to turn my attention to the receiver soon, the bottom and legs are a bit rusty, so some flap wheel work ahead of me.
That's all for now.






), drilled 47/64", the closest drill I had to the tapping size, and the the tap run in. I then needed to machine the boss for clearance for the fitting and to square it up, which is where my recently purchased boring head came into play again. What did I do before I had one?
But it's only light so not a worry.
, so that was the first operation. No pictures.


Doing a great job