I'm only quoting as this is the most recent time I've seen it, can you provide links to show the information that the grid cannot currently cope?
I've said before, I add huge loads to the grid (750 amp startup current is next) so obviously we get DNO surveys and approval, the amount of upgrades carried out is quite staggering
There is a village near by with a farmer which runs holiday villas
Had 2 family's come down from London with teslas, the grid in remote locations wouldn't charge them. And to recharge them on the 13amp sockets wouldn't recharge in suitable time frame.