Hi all,
I am getting ready to put some epoxy primer on the bottom of my herald tub in the next week or so but am wondering how I am going to key the metal ready for the primer. I can’t DA it as there are loads of ribs and boxes so I was thinking of scotchbrite.
If this is an accepted method, what grade do I need? I have loads of red labelled as fine but do I need something a bit coarser?
Thanks
Shaun
I am getting ready to put some epoxy primer on the bottom of my herald tub in the next week or so but am wondering how I am going to key the metal ready for the primer. I can’t DA it as there are loads of ribs and boxes so I was thinking of scotchbrite.
If this is an accepted method, what grade do I need? I have loads of red labelled as fine but do I need something a bit coarser?
Thanks
Shaun