Ton-up
Member
- Messages
- 2,344
- Location
- Essex, England.
I know you said your’e not finished, but surely its not a good idea to 1) weld a plate thats pulling to the centre of the box and 2) on the side where the weld on the box is?getting there. Just the ram mounts to do now. Felt crap from 2nd jab today so progress was slow.
View attachment 306089 View attachment 306090 View attachment 306091 View attachment 306092




the beam is way bigger and heavier than it needs to be for the weight it will carry, I could have got away with 203 UB with suitable bracing but this 305 UB was here and it meant less bracing required, and a naturally deeper pivot which lowers the moment. SWL will be 500kg at the end and 800kg at the midpoint, and it's limited by the telehandler capacity as much as the design.