mrsbruce
Member
- Messages
- 1,974
- Location
- Livingston, Scotland
Before the snow, another area cleared, new gravel barrowed through, and random slabs set in place, and levelled.
After snow, my 6’ x 4’ greenhouse finally built, half the bolts drilled through the slabs to stop it flying off in a wind, and just the shelving to build. I have the tube frame from my old poly greenhouse, so I will use that to build my shelves. The mound of junk to the right actually consists mainly of the greenhouse contents.
Just one question, I levelled the slabs prior to the bad weather, and it was still a good 3cm off when it came to building the greenhouse. So....was my level out, or does the Earth really suck.

After snow, my 6’ x 4’ greenhouse finally built, half the bolts drilled through the slabs to stop it flying off in a wind, and just the shelving to build. I have the tube frame from my old poly greenhouse, so I will use that to build my shelves. The mound of junk to the right actually consists mainly of the greenhouse contents.
Just one question, I levelled the slabs prior to the bad weather, and it was still a good 3cm off when it came to building the greenhouse. So....was my level out, or does the Earth really suck.


