Oh I did not know there was a thread for stuff you have fixed, well my last post would fit better here then. But it's already posted so I will just link it:
(fixed an oscilloscope)
Stuff you have made today
A little add on for my vertical linisher. Uses the belts widely available from Lidl Aldi etc. Great for curved surfaces where a hard backing is not required. Took a bit of fettling on the tracking, but works great
www.mig-welding.co.uk
(fixed an oscilloscope)




). For the footings of the 4 columns we're planning doing 500 by 500 x 300mm deep. All reinforced with rebar, and that will be tying into the roughly 100mm thick slab, an all in one pour...Obviously we'll order the truck based on the final dimensions, but fag packet calcs come out somewhere between 4.5 and 5m3. The majority will be around 100mm thick, so a week per inch would be about the 4 weeks, albeit the footings for the columns would be thicker... think it should be right?