Richard.
Member
- Messages
- 18,335
- Location
- Cambridgeshire
If that pipe was 5mm thick or more I would absolutely put a small prep on it. If I wanted to I could fill it flush with one run getting penetration right down and  put the second run on top as you suggest only doing which will be a superior joint.
				
			



 
 
		 
 
		 
 
		

 
 
		
 
 
		