Thanks, ill tweak it a bit tomorrow. Power is all there on the wall. The parts order for the electrical side is delayed due to items being on back order. There will be a cabinet on the side of the base to house the VFD, contactor etc plus provide power distribution to Ancillaries such as Coolant, DRO and lamp.