well that was a lot of sweat...just started grading it out. no more material should need to be removed, just moved about.
![]()
![]()
its pretty nearly there now, just have to get the grade right, compact it with the wacker plate, pour the retaining wall, put ground fabric down, sharp sand then block paving. once done ill pour a concrete wedge along the front and job jobbed.
final grade and compacted



road fabric and shuttering completed (i know its not straight. i ran out of motivation. never let perfect be the enemy of good enough. its not as bad as it looks in that pic) it gets wider as it gets closer to the road as the depth increases. this is intentional.



and poured. 3/4 ton of aggregate(a guess, may be less...), and 2.5 bags of cement.





i am absolutely knackered.