In the lowest place that wil be about 4" but most of the way round its its min 6", couple of places its deaper than that.
The ground is hard, already got stones beded in and im leaving a thin/single layer of stones to lay on.
Ive been reading online and mix'es are anything between 4-1 and 6-1. Im gessin about 4-1 or 5-1. Not sure on how wet to have it, any suggestions on how much water would help a great deal.

The ground is hard, already got stones beded in and im leaving a thin/single layer of stones to lay on.
Ive been reading online and mix'es are anything between 4-1 and 6-1. Im gessin about 4-1 or 5-1. Not sure on how wet to have it, any suggestions on how much water would help a great deal.
