For anyone who is following or interested in this build.
All four square's are concreated and hard, ive given the inside a rough white coat but it all has had two coats of wood treatment first.
I have layed over the concereate 3/4 ply right through as I hate concreate under foot, also warmer and nicer to sit on incase I need to work off the floor. Been treated both under and ontop, all precausions taken to prevent wood rot.
Still lots to do but running low on time, got to be done hear and there from now, two weeks I think, I hope. So will have plenty of time for the concreate to go off solid but feels tough under foot.
All four square's are concreated and hard, ive given the inside a rough white coat but it all has had two coats of wood treatment first.
I have layed over the concereate 3/4 ply right through as I hate concreate under foot, also warmer and nicer to sit on incase I need to work off the floor. Been treated both under and ontop, all precausions taken to prevent wood rot.
Still lots to do but running low on time, got to be done hear and there from now, two weeks I think, I hope. So will have plenty of time for the concreate to go off solid but feels tough under foot.