addjunkie
Forum Supporter
- Messages
- 11,647
- Location
- Northumberland. Reet oot in the sticks
Hand mixing a shed base isnt the best of ideas I agree. Last 4 Ive done, weve been lucky enough to either be able to get a 3 ton dumper in or the mixer lorry right up to allow the mix to run don a home made scaff board shoot lined with visqueen.
Did barn conversion sub floors 15 cubes, in two drops bing bang bosh 2 hours. 3 of us. A good uniform quality mix helps too. Barrowing in the 15 m3 of screed wasnt a good idea either. And the push was down hill.
Did barn conversion sub floors 15 cubes, in two drops bing bang bosh 2 hours. 3 of us. A good uniform quality mix helps too. Barrowing in the 15 m3 of screed wasnt a good idea either. And the push was down hill.