Dave-sparks
Member
- Messages
- 696
- Location
- Woking
the mem ones the leccy board were fitting years ago wernt much better along with there fitters ive seen loads burnt out![]()
That's mostly the limp wristed fitters who can't do a terminal up properly.
In this area SSE were fitting the self-connect meters that have the built in isolator and seperate terminal covers for incoming and outgoing. Its plain daft that this wasn't made a part of the smart meter specification when they had the chance.