We had two sheds in the garden, the 12' x 8' and an 8' x 6' which was directly behind it with one side against the end of the 12' x 8' shed. The 8' x 6' was on the same slabbed base as the 12' x 8' and all we want to do is move the 12' x 8' shed about 6ft back, further down the garden. As it is on a level base which already had a shed on it I'd rather not take it to bits if at all possible.
Has anyone tried this before and, if so, what method did you use and did it work?
Has anyone tried this before and, if so, what method did you use and did it work?