Setting it down on the bearers was the reverse of lifting off, the bugger was getting it to sit level as the slabs it was on were rather uneven. Managed it in the end though, now all I've got to do it finish digging the 600mm+ deep trench for the longer power cable.now all I've got to do it finish digging the 600mm+ deep trench for the longer power cable.
Through clay soil.
Oh joy!
a blind man would be glad to see thatMakes a change to hear someone doing it properly instead of a bit of T&E fixed to the fence.....
View attachment 47201
a bit of farmworkMakes a change to hear someone doing it properly instead of a bit of T&E fixed to the fence.....
View attachment 47201



