Hi all, I've been reading a lot recently, but I'm a little unsure as my next step.
I've used lechler epoxy after rave reviews on here. Now I'm planning to high build on top of the epoxy (which has been on about a week). Do I just rough the epoxy up a bit with something like 400 dry? Or can I just go directly onto it without keying?
Sorry for the noob questions, but I haven't managed to find a definitive answer. (Although I'm sure there is one on here!)
Thanks in advance, Stu
I've used lechler epoxy after rave reviews on here. Now I'm planning to high build on top of the epoxy (which has been on about a week). Do I just rough the epoxy up a bit with something like 400 dry? Or can I just go directly onto it without keying?
Sorry for the noob questions, but I haven't managed to find a definitive answer. (Although I'm sure there is one on here!)
Thanks in advance, Stu