I thought acetylene could be transported laid down as long as when it was stood back upright is was left for a while to let the acetone settle again.
Woz, oh master of all gasses, - can you confirm?![]()
20 mins tops i think - gas bottles out first, then rest of the stuff unloaded, then get to work with them!I saw quite an argument on site when contractors turned up with bottles lying in back of Transit - engineer would not issue a hot work permit 'til they had stood for 24 hours.2 days!20 mins tops i think - gas bottles out first, then rest of the stuff unloaded, then get to work with them!
Most don't have a clue about stuff like that. Was once asked by a site manager if we would solder some scaffold tubes to some sheet piles as a handrail.
Solder? Sure?

Good question, Even Mr Health and safety couldn't give a sensible reasonWhy?