I thought acetylene could be transported laid down as long as when it was stood back upright is was left for a while to let the acetone settle again.
Woz, oh master of all gasses, - can you confirm?
I saw quite an argument on site when contractors turned up with bottles lying in back of Transit - engineer would not issue a hot work permit 'til they had stood for 24 hours.2 days! 20 mins tops i think - gas bottles out first, then rest of the stuff unloaded, then get to work with them!
Most don't have a clue about stuff like that. Was once asked by a site manager if we would solder some scaffold tubes to some sheet piles as a handrail.
Solder? Sure?
Good question, Even Mr Health and safety couldn't give a sensible reasonWhy?