To be honest I’ve already put the conduit up for the lighting which runs along purlins and support trusses, that was much more difficult and it went up quite quickly, I reckon I’ll have the wall conduit up in a day, then it’ll all be matching, only a small part of the install has 9 wires, the rest is just the ring main.
If I have to have a double run for the first quarter it’s no big deal.