- Messages
- 23,545
- Location
- Birmingham
You realise the limits on the rods you can burn before it needs a charge up? . Your still going to do 99 %of your work with leads.
Just run the power lead and keep short ones from the machine, wear it on your back
We normally get 20+ 2.5mm rods out of a full charge on our Lorch sets and as we have 3 in the building we can always borrow another battery to finish the job






that's It in a nutshell. if u want it at 200 meters there's no problem as long as u double the csa size of cable .eg 6 or 10mm and use a joint box and reduce the beginning to 2.5mm to fit the 13 amp plug 