Robert Mullins
Member
- Messages
- 222
- Location
- Salisbury, uk
This has opened a whole can of worms, a welding engineer where I used to work, said that the new practise within the oil refinery/pipe line is to remove, and reweld butt welds as steel continues to absorb hydrogen with the passage of time: but according to what your saying, this is a temporary and the hydrogen will escape within 72 hours

