rcx132
Philip
- Messages
- 2,705
- Location
- London, UK
It cost me about £2000 to get 3 phase installed in to my property from the pavement in front of my house. That basically covered digging up the pavement, supplying and installing the new cable, cable head and isolator. I then had to get my own sparky to do the rest of the work installing DB, sockets etc. The new meter was free from my electricity supplier.
That's kind of the price my late step father paid. We ran the cables to the front of our property and then a company came, dug up the pavement and made the connection. I don't recall the cost exactly, but it wasn't much over a grand, that was 15 years ago.