M Melvyn Best Member Messages 1,801 Location Cambridge Jul 10, 2025 #21 Does it have to be new timber? Do you have an architectural reclamation company near you?
Robotstar5 Casanunda Staff member Messages 23,190 Location Birmingham Jul 10, 2025 #22 I wanted to build an engine trolley to factory specs, I had to pay for the next size up and the mill cut it down to 4x2
I wanted to build an engine trolley to factory specs, I had to pay for the next size up and the mill cut it down to 4x2
dobbslc Forum Supporter Messages 13,068 Location Hertfordshire UK Jul 10, 2025 #23 I think I'm gonna go to the timber reclamation place near me on Saturday and see what they have, if not then I'll have to cut down something bigger.
I think I'm gonna go to the timber reclamation place near me on Saturday and see what they have, if not then I'll have to cut down something bigger.
gaz1 Member Messages 20,123 Location westyorkshire Jul 10, 2025 #24 if you cant get it in sawn wood you will have to buy the 5x2 but it wont be 5x2 as its planned yet again width will be 47mm though
if you cant get it in sawn wood you will have to buy the 5x2 but it wont be 5x2 as its planned yet again width will be 47mm though