- Messages
 - 23,555
 
- Location
 - Birmingham
 
You realise the limits on the rods you can burn before it needs a charge up? . Your still going to do 99 %of your work with leads.
Just run the power lead and keep short ones from the machine, wear it on your back
We normally get 20+ 2.5mm rods out of a full charge on our Lorch sets and as we have 3 in the building we can always borrow another battery to finish the job






that's It in a nutshell. if u want it at 200 meters there's no problem as long as u double the csa size of cable .eg  6 or 10mm and use a joint box  and reduce the beginning to 2.5mm to fit the 13 amp plug 