KemppiFrog
Member
- Messages
- 4,298
- Location
- Aquitaine
I put up some sketches a while back of my early stove efforts. Well, I it was 'mentioned' that the dining room/stair area was a bit chilly and we are having eight over on Tuesday for eats.
Taking the hint..... I got busy.
Here is the old thread: http://www.mig-welding.co.uk/forum/threads/early-wood-burner-designs.39998/#post-485802
First photo is the basic box. 4mm steel with the door frame in 8 x 40mm flat.
Next is the top baffle with the secondary air inlet welded to it. The tube exits at the back via that square hole.
Baffle fitted.
Followed by the convection tubes in 43mm tube.
Top baffle. It had to be in sections due to the taper of the sides.
Today I will finish the door, add some feet, the top plate & flue collar.... and tidy up...
so more to come.
Taking the hint..... I got busy.
Here is the old thread: http://www.mig-welding.co.uk/forum/threads/early-wood-burner-designs.39998/#post-485802
First photo is the basic box. 4mm steel with the door frame in 8 x 40mm flat.
Next is the top baffle with the secondary air inlet welded to it. The tube exits at the back via that square hole.
Baffle fitted.
Followed by the convection tubes in 43mm tube.
Top baffle. It had to be in sections due to the taper of the sides.
Today I will finish the door, add some feet, the top plate & flue collar.... and tidy up...
