Again, its not somewhere youd like to sit and eat a crate full of meat pies![]()
Hmmm, that's some big bits to go missing, I thought the photo was taken part way through you fitting them. I've been lucky so far, had some fairly small bits dipped and they've all been accounted for but my mate works for a place which makes seating and he said they've always got to send extra cos bits get dropped into the tank and not recovered. Is that the same rendering plant you did that conveyor for?
Yes, it is.
Iff its small bits we normally send an extra, but something that big!!??
Either dropped in the tank, or delivered to the wrong place- we normally have our galv collected and bought back.
It would have stuck out too far Steve, it would have needed a landing in the middle, then the final tread would have been probably about 500mm past where the corner one finishes, plus then you would need another 1200mm clear pedestrian walkway. Making it a bit tight for artic unit to get round the corner and onto the weighbridge.