ronan
Member
- Messages
- 11,399
9 tea breaks is the minimum I am prepared to consider. I'm not a slave !
Before lunch.
Are you ex-british leyland by any chance

9 tea breaks is the minimum I am prepared to consider. I'm not a slave !
Before lunch.
At least nine....plus time for bacon sandwich. ..hungry work negotiating a task....9 tea breaks is the minimum I am prepared to consider. I'm not a slave !
Before lunch.
I've got to crimp a terminal to a wire. Its a lot of work, but I'll just have to knuckle down and get it done by Crimbo.
I never even thought about making a Wood Burner out of a gas bottle.. I have a few spare bottles and have just bought a Plasma Cutter, so this will make an idea first project.. That said, cutting a bottle bothers me a little, so will have to take every precaution to ensure its empty...
But that said, I have always wanted a forge and I wonder if I can find a project to make one using said propane bottle....
Well I'm just glad to hear I'm not the only one that never seems to finish a project.
Iv got 12 bikes. It has got out of hand!
what ya doing with the single sided swinging arm tiggy ?