Pete.
Member
- Messages
- 14,810
- Location
- Kent, UK
I used the term "shuttering" which is what it is to all intent and purpose. I am actually using nylolite boards as opposed to ply boards. I already have a few nylolite boards. Hence why I need to drill holes and fasten with clips/m6 setscrews. It is not possible to hammer nails in to this material.
The nylolite is good against wet soil, which is what I am holding back while I do a job close by.
I hope that you're talking only a very low amount of soil to hold back with no vehicular or plant traffic on it. If you're excavating on a slope or something and thinking to bowl your spoil over the boards up-slope of your trench then that would be very risky.