I have a job to do shortly which involves welding a 100MM Sched 40 pipe onto a 12MM plate and I'm not quite sure how to prep. Material is mild steel.
Would it be best to cut a hole in the plate or just butt weld to it ?
If cutting a hole should that be prepped in any way ?
How should the pipe be prepped in either case ?
The assembly will be taking a fair bit of stick so I need to determine best practice for the task.