Cato
Member
- Messages
- 2,171
- Location
- Birmingham, UK
Following on from chatting about digger prices (IRL) increasing a lot of the costs for components is relatively easy to see.
Is there a figure for the increased cost of welding? I'm thinking percentage per inch of mig for steel or similar measure. Gas, electricity and steel have all increased so aside from the material cost in a boom or bucket the cost of sticking them together must be well up too.
Is there a figure for the increased cost of welding? I'm thinking percentage per inch of mig for steel or similar measure. Gas, electricity and steel have all increased so aside from the material cost in a boom or bucket the cost of sticking them together must be well up too.