I need to put my J&S 540 into storage ready for a move. I did not handle the delivery so it was easy to get in but I will be doing the move this time. The thing is light compared to the gear I have already shifted.
My problem if I have one is that I do not know how to secure it on the drop sider I will use. I have made a pallet ready for the move and can get the machine onto the pallet and onto the bed of the drop side. Storage have a lift truck so that is covered.
I would have used a Sprinter as the side rails would take a pair of hold downs to secure the machine mid body but the doors are just shy of machine height stood on pallet. With a drop side my anchor points are below the pallet.
Have any of you shifted a 540 yourself?
My problem if I have one is that I do not know how to secure it on the drop sider I will use. I have made a pallet ready for the move and can get the machine onto the pallet and onto the bed of the drop side. Storage have a lift truck so that is covered.
I would have used a Sprinter as the side rails would take a pair of hold downs to secure the machine mid body but the doors are just shy of machine height stood on pallet. With a drop side my anchor points are below the pallet.
Have any of you shifted a 540 yourself?