I have one...it's about 30 sq m and I haven't had any issues.Are these generally true? Any opinions on avoiding a prefab workshop?
On mine I could bolt battens to the joints (comptons supplied the brackets)....then I did rock wool, vapour barrier then ply lined.
One big disadvantage I have is head height....but I think now you can buy high roof versions?
Other thing I did was pay the extra for a pitched roof....its steel truss with felt and batten but with metal tiles that look like clay. Been very happy with mine...I wanted it sorted quickly....took 1.5 days to build so can't complain.
Also I got the base built up a good 4 inches above ground level all round...I'm on a slope and I didn't want to risk flooding...worked really well and I suspect building the base too low is the main reason people get leaks.