premmington
Member
- Messages
- 6,677
- Location
- Norfolk
My mate is a digger driver and is working at Sizewell. To tick the green box they have some electric excavators on site he's driven one a 20 tonner and said it was lovely to drive and nearly silent but could only get 3 1/2 hours work from a full charge.
And this is the best bit they are being charged by diesel generators overnight.
I seen photos of this - big electric plant tethered to diesel big gensets - the size of lorrys









