Rrunnach
Member
- Messages
- 1,127
- Location
- Scotland
Who knows what will be done to repair fatigue'd area. Certainly a job for a good welding engineer, factor in a few buttering rods, heating bands, pyrometers and, extensive NDT, then fix fatigue'd area, maybe with extra material added to beef up area but, looking at pics, large bolt at bottom, does not lend area for additional strengthening matl to be added?
Maybe a fix is impossible, new brig should have been a tunnel, which would now be operational. I feel sorry for the folks who use brig daily.
Maybe a fix is impossible, new brig should have been a tunnel, which would now be operational. I feel sorry for the folks who use brig daily.