I assume the portal frame was adequate,just add those ties at the apex?Installed the main steelwork for a handy little 2t crane today.
Finish off by putting the cable festoon track, hoist etc on tomorrow, and sort the lights.
I measured it up a few weeks ago and had it fabricated at my previous employers as that's more their line of work. Everyone seemed to be making a fuss about how much of a job it would be for some reason.
Easy little number if you ask me.
View attachment 353576
I’m upgrading mine in the future.