100% that. To be fair, they usually come back within a day or 2, but this time the structural engineer wanted to check it all over before signing off. Then went on a Christmas break before doing anything.May be the time to add into quotes that they are based on current steel prices of £x per ton and any increase/decrease in steel prices will be passed on. Can’t be fairer than that .
Bob