I'm planning to add a new shower, basin and wc into the right of this building and was wondering about how to add the drains, it will be inspected by building control so need to get it right.
It looks like this just now with a stack for the existing utility room sink and a rainwater pipe.
I plan to use the existing inlet into the stack to add the waste from the new shower and sink, and was thinking of doing it like this? Anyone know if that is acceptable?
If not, do I need to do it like this, which will mean putting a new hole in the cast iron pipe.
It looks like this just now with a stack for the existing utility room sink and a rainwater pipe.

I plan to use the existing inlet into the stack to add the waste from the new shower and sink, and was thinking of doing it like this? Anyone know if that is acceptable?

If not, do I need to do it like this, which will mean putting a new hole in the cast iron pipe.