Luke
Forum Supporter
- Messages
- 1,929
- Location
- Whitchurch, Shropshire
Have doneAbsolutely Luke! PM me.
Cheers
Ped
Have doneAbsolutely Luke! PM me.
Cheers
Ped
Yeah but you are drinking them. LolI work on bottles of red wine per hour
You have to be a member to download the file.
Cant download it....@rtbcomp can this go in the links section
A good rule of thumb is to take the cost of the material, double it and add 10-15% to the total for time/consumables.
Increase the percentage of the design/setup is complex or particularly involved.
If the material is dear (sheets of stainless) consider getting the client to pay up front or at least cover the cost of materials.
@rtbcomp can this go in the links section