I am setting out the foundations pads for my 10m by 5m steel portal framed shed, 3 frames with one frame at 2.4m to eaves and the other two at 3.4m to eaves as the ground slopes.
The higher 3.4m to eaves half of the building will have a solid concrete floor and the other half of the building will have a suspended floor.
I will most probably spec the frames for a local fab company to make up in 175mm by 100mm UB.
So my question is what size concrete pad and how deep?