I'm fixing the floor pans in a 2cv. The replacements would be thin steel (0.8mm) and will rot out again in no time.
Therefore, I am going to have a go at making my own using 1.2mm or even 1.6mm since they are basically flat panels.. Using box section for the strengtheners underneath. For plug welding the thicker steel (i.e holes drilled in the thicker steel) to the edge of the sills etc do i follow the tutorial or is there a different technique. Hope this makes sense.-I've bought a Portamig 185 .
Therefore, I am going to have a go at making my own using 1.2mm or even 1.6mm since they are basically flat panels.. Using box section for the strengtheners underneath. For plug welding the thicker steel (i.e holes drilled in the thicker steel) to the edge of the sills etc do i follow the tutorial or is there a different technique. Hope this makes sense.-I've bought a Portamig 185 .