addjunkie
Member
- Messages
- 13,777
- Location
- Northumberland. Reet oot in the sticks
We use a mix of crusher run and road plannings. What ever is cheapest. Tried some crushed brick filling holes, it was cheap, but didnt bind so well.
Last year we were lucky enough to use 20 ton of road plannings on a hot day, whacked it in, works a treat. Only problem, not enough hot days.
And with crusher run, it is always cheaper to get 40 mil than the 32 which is also known as type 1 subbase. And makes no noticable difference.
Last year we were lucky enough to use 20 ton of road plannings on a hot day, whacked it in, works a treat. Only problem, not enough hot days.
And with crusher run, it is always cheaper to get 40 mil than the 32 which is also known as type 1 subbase. And makes no noticable difference.