Jim_gsxr1000
Mechanical Magician
- Messages
 - 1,296
 
 Removed the valve
 Filled with warm water to displace the gas and then filled with warm water and bleach (Tesco pine fresh) works the best (was used on the gas plant i used to work on untill the HSE muppets put a stop to it)
 Cylnder with valve removed, all gas removed and stench removed
 Marking up the door for cutting
 Hinges in place with duck tape
 Hinges in process of being fitted
 Hinges fitted (will be removed for cutting)
 Top handle cut off using a grinder and 1.0mm cutting disk
 Hinges re fitted after making first cut.
 Finished cutting door and removed all sharp edges with a file.
 Nuts fitted to back of door bolts theese were also tapped out to M6 so i could fit hinges before the door was open.
 Top ready for marking out the 4" hole for the flue
 The hany tool i made for marking out the hole its a pencil glued to the valve the tip of the pencil is 2" from the centre of the screw thread
 i marked out the circomfrance of the hole and then witness marked it in preperation for cutting (a pencil line will just burn off and you will be lost 
 Ready to cut 4 holes put in to avoid having to burn through the thick threaded collar
 All ready to cut (now where did i put that sparker)
 Hole cut about 1/8" inside witness marks to alow fine tuning when i aquire a bit of pipe for the flue
 Hole cut just need to find a pipe for the flue and make my baffle plates
			
				Last edited: 
			
		
	
								
								
									
	
		
			
		
	
								
							
							




 mabey next year, only oxy prop, gona take the hinges off cut along hinge side with angle grinder and 0.8mm cutting disk refit hinges and then cut out rest of door, was looking at plasma part machines any experance of them ?



