dobbslc
Forum Supporter
- Messages
- 12,875
- Location
- Hertfordshire UK
This is a work thing not my own doing but I'm intrigued to know what the three phase motor experts here think. A large pump control panel went bang and we are getting the blame for a "power surge", when I got sent the photos I spotted that contactor K2 looks linked out on the load side, the photos are quite bad though.
I was later sent the schematic where it also appears to suggest that once contactor K2 is switched it will result in a large Billy banger!
I've not seen this in the flesh but surly it isn't right.
All thoughts and thread drift welcome



I was later sent the schematic where it also appears to suggest that once contactor K2 is switched it will result in a large Billy banger!
I've not seen this in the flesh but surly it isn't right.
All thoughts and thread drift welcome



