would/could it be easier to add an extra strip of 6mm ali behind the join, and then leave a gap between the sheets?
I'm guessing it doesn't really need to be strong/need a lot of penetration, just needs to hold itself in place and seal all the gaps?
also... how are you going to do the roof?
I'm guessing it doesn't really need to be strong/need a lot of penetration, just needs to hold itself in place and seal all the gaps?
also... how are you going to do the roof?





I don't think so. So I informed BOC that they can shove their machine up their back passage and asked for a refund. Now please don'y get me wrong I manly just did sample welds to get a feel of the EWM and it did produce some great welds (steel only) I was not going to splash out on push pull guns for alli if they didn't support what I had. 
.
. And we hope to hell we never do