N
naughtyboy
Guest
got to weld machine frame at work, but laeds on arc welder wont reach.
boss is ordering in some 5m leads.
will i need to increase amps etc to allow for voltage drop or anything?
only ever used short leads for welding.
cheers
boss is ordering in some 5m leads.
will i need to increase amps etc to allow for voltage drop or anything?
only ever used short leads for welding.
cheers

i know he said 5m
ive never seen any welding leads half a meter in length . the leads on mine are 8 meters long
thought i had put 5 m