Onoff
In the land of the unfinished project I am King!
- Messages
- 12,363
- Location
- Sevenoaks, UK
Hopefully on Saturday I'll be resin fixing some level 6*2s on the opposing walls. To these I'll affix joist hangers.
I'll temporarily fit some joists and floor boards then a Velux.
All the crap will be bagged up and launched out the Velux down into the back garden. This to limit the dust in the house.
New 270mm new insulation. 100mm between the existing ceiling joists then 170mm in top at 90deg.
Fit the new joists permanently and some noggins. Loft ladder.
Job done.
I'll temporarily fit some joists and floor boards then a Velux.
All the crap will be bagged up and launched out the Velux down into the back garden. This to limit the dust in the house.
New 270mm new insulation. 100mm between the existing ceiling joists then 170mm in top at 90deg.
Fit the new joists permanently and some noggins. Loft ladder.
Job done.