Might be it's very likely.Might be moving premises. Had enough of water leaks and rats!
The new place only has a single phase meter. The other units are apparently 3 phase. Does this grey box underneath mean it has 3 phase coming in? If so I assume a simple job to connect up?
View attachment 470901View attachment 470902
About the same size but square so a more sensible shape. Can get a lot more racking in so can tidy up a lot!Looks like 3 ph to me Vince, but best ask National Grid (used to be WPD). Also ask them what the full mpan would be if you re-connected the 3ph, it can make a huge difference to your standing charge - our rugby club is paying £6.00 a day......
Is the new place smaller? Which means you'll be having a sale...
Also a secure area alongside the building just asking for a 40' container
PLEASE Don't give me ideasYou can stack them you know!
Of course it's all done with a quick change, just like air hoses & lathe toolposts:PLEASE Don't give me ideas![]()
Try hang on to that old clock meter for as long as you canMight be moving premises. Had enough of water leaks and rats!
The new place only has a single phase meter. The other units are apparently 3 phase. Does this grey box underneath mean it has 3 phase coming in? If so I assume a simple job to connect up?
View attachment 470901View attachment 470902
get the 3 phase in and they will make you have one or they wont fit itTry hang on to that old clock meter for as long as you can![]()
Oh yes there will be loadsIf you move will you rediscover all the stuff you bought and misplaced or forgot about?