Mate of mine wanted some flat bar so went to the stock holder that's only a couple of miles away from him. All was in 6.1 m lengths and he wanted to collect in his trailer. His job didn't require long pieces so they cut it with the gas axe into approx 2 m pieces. Never seen such a mess. Going to be a lot of waste by the time he's cleaned the ends up. Still cheaper than paying their exorbitant delivery charge which was several times the cost of the steel.