Not welding, but as there's a lot of level headed people here, someone might know 
Whats a realistic cost to render a "2 up, 2 down" semi, including scaffolding etc?
After the winters downpours, I have water damage on the whole front of the house, and looking at the render I can see why - it's cracked in numerous locations.
Based in north west kent, if that makes much difference.

Whats a realistic cost to render a "2 up, 2 down" semi, including scaffolding etc?
After the winters downpours, I have water damage on the whole front of the house, and looking at the render I can see why - it's cracked in numerous locations.
Based in north west kent, if that makes much difference.