Northumbrian
Member
- Messages
- 138
- Location
- Portugal
OK, in order to get electric back on in the workshop, I've the RCB's needed to replace the melted ones, and a buzzbar.
Hopefully, the box is ok, and I can just swap out the burnt RCB's, this should hopefully get power back on, and lighting to sort out the new box.
Then, rewire at my leisure.
The Workshop is fairly new, so only after working in there for the past year have I now got a idea of where I want everything to be.
The current box was only a standby until I'd gotten the workshop organised.
Hopefully, the box is ok, and I can just swap out the burnt RCB's, this should hopefully get power back on, and lighting to sort out the new box.
Then, rewire at my leisure.
The Workshop is fairly new, so only after working in there for the past year have I now got a idea of where I want everything to be.
The current box was only a standby until I'd gotten the workshop organised.